Iroquois Gas Transmission System, L.P.

FIRST REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 06/01/1997, Docket: RP97-161-002, Status: Effective

Second Revised Sheet No. 73 Second Revised Sheet No. 73 : Effective

Superseding: FIRST REVISED SHEET NO. 73

11.2 Check Measuring Equipment. Shipper may

install, maintain and operate, at its own expense, such check

measuring equipment as desired, provided that such equipment

shall be so installed as not to interfere with the operation

of Transporter's measuring equipment at or near any Delivery

Point.

 

11.3 Measurement Statements. Transporter shall prepare

monthly measurement statements on or before the fifth (5th)

Business Day of each month for all quantities transported by

Transporter during the preceding month.

 

11.4 Right To Be Present. Transporter and Shipper

shall have the right to have representatives present at the

time of any installing, reading, cleaning, changing,

repairing, inspecting, testing, calibrating, or adjusting

done in connection with the other's measuring equipment used

in measuring or checking the measurement of deliveries of gas

under any Gas Transportation Contract or Park and Loan Service

Contract between Transporter and Shipper. The records from such

measuring equipment shall remain the property of their owner, but

upon request each will submit to the other its records and

charts, together with calculations therefor, for inspection and

verification, subject to return within thirty (30) days after

receipt thereof.

 

11.5 Care Required. All installations of measuring

equipment applying to or affecting deliveries of gas shall be

made in such manner as to permit an accurate determination of

the quantity of gas delivered and ready verification of the

accuracy of measurement. Reasonable care shall be exercised

by both parties in the installation, maintenance and

operation of pressure regulating equipment so as to prevent

any inaccuracy in the determination of the volume of gas

delivered under any Gas Transportation Contract or Park and Loan

Service Contract.

 

11.6 Calibration and Test of Meters. The accuracy

of Transporter's measuring equipment shall be verified by

Transporter at reasonable intervals, and if requested, in the

presence of representatives of Shipper, but Transporter shall

not be required to verify the accuracy of such equipment more

frequently than once in any thirty (30) day period. In the

event either party shall notify the other that it desires a

special test of any measuring equipment the parties shall

cooperate to secure a prompt verification of the accuracy of

such equipment. The expense of any such special test, if

called for, shall be borne by Shipper if the measuring

equipment tested is found not to be in error by more than two

percent (2%).