Iroquois Gas Transmission System, L.P.

FIRST REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/09/2006, Docket: RP06-216-001, Status: Effective

Sub Sixth Revised Sheet No. 67 Sub Sixth Revised Sheet No. 67 : Effective

Superseding: Sixth Sheet No.67

 

 

 

GENERAL TERMS AND CONDITIONS (continued)

 

7.3 Delivery Points. Transporter shall make available

to each Shipper one or more Primary Delivery Points, the exact

number and location to be determined by mutual agreement between

Transporter and Shipper. The Primary Delivery Point(s) at which

Transporter will make gas available to or on behalf of Shipper

shall be those set forth on Schedule 2 appended to the Gas

Transportation Contract (s) between Transporter and Shipper, or

other mutually agreeable points. Such Schedule 2 shall also set

forth the Maximum Equivalent Quantity and maximum and minimum

delivery pressures applicable to each such Primary Delivery

Point. Subject to the availability of capacity, all other

delivery points within the same Zone/Lateral or any other Zone

shall be available as Alternate Delivery Point (s) for Shippers

receiving service pursuant to Gas Transportation Contracts, for

Firm Reserved Service under Part 284 of the Commissions

Regulations up to the Shippers Maximum Equivalent Quantity

at its Primary Delivery Point(s).

 

7.3.1 Extended Deliveries. Shipper may use

delivery points in a zone other than the zone of its Primary

Delivery Point. To the extent Shipper uses alternate Delivery

Points that are on Transporter's mainline (other than the

interconnection between the mainline and Lateral)and beyond the

path of a Lateral Service contract, such Shipper shall be

restricted to Extended Delivery Point service only. In order

to use such extended delivery point, shipper must request such

Extended Delivery by nominating the following information in

Iroquois' EBB with the following information:(1) the point at

which Shipper desires to deliver gas and (2) the requested

quantity to be delivered at that point.

 

7.4 Additions and Deletions of Primary Delivery Points.

Effective Schedule 2 appended to each Gas Transportation

Contract between Transporter and Shipper under Part 284 of the

Commissions Regulations may be revised from time-to-time in order

to reflect additions or deletions of Primary Delivery Points or

changes in the Maximum Equivalent Quantities or minimum delivery

pressures applicable to such Primary Delivery Points. Additions

or deletions of Primary Delivery Points and/or changes in the

Maximum Equivalent Quantities or delivery pressures applicable

to Primary Delivery Points hereunder shall be subject to the

provisions contained in Section 3 of the RTS rate schedule.

Transporter shall not be required to accept an amendment if

there is inadequate capacity available to render the new service

or if the change would reduce the reservation charges applicable

to the agreement. A Shipper requesting a change to its Primary

Delivery Point, which requires no additional mainline capacity,

shall not be required to participate in an Open Season.

 

7.5 [RESERVED FOR FUTURE USE]

 

7.6 [RESERVED FOR FUTURE USE]