Iroquois Gas Transmission System, L.P.
FIRST REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/17/2006, Docket: RP06-177-000, Status: Effective
Fourth Revised Sheet No.52 Fourth Revised Sheet No.52 : Effective
Superseding: Third Revised Sheet No.52
transportation over the delivery period. For service under
the HUB or PAL Rate Schedules, the Maximum Balance Quantity
for which Shipper requests park and loan service stated in
Dekatherms.
(c) Receipt/Delivery Point(s). The Receipt
Point(s) and Delivery Point(s) for the requested
transportation service together with the name of the entity
which will deliver the gas to Transporter and the name of
the entity to receive the gas from Transporter.
(d) Term. The proposed commencement and
termination dates of service.
(e) Shipper Certification. For
transportation or hub service, a statement by Shipper
certifying (1) that Shipper has title or a current
contractual right to acquire title to the gas supply for
which transportation is requested; (2) that Shipper has or
will enter into all contractual arrangements necessary to
ensure that all upstream and downstream transportation is
in place prior to the date on which service is requested to
commence; and (3) that the end-user of the gas (if other
than the Shipper) has entered into gas purchase contracts
(or precedent agreements therefore) to acquire title to the
gas for which transportation service is requested. For
park and loan service, a statement by Shipper certifying
(1) that Shipper has title or a current contractual right
to acquire title to the gas supply for which parking
service is requested; and (2) that Shipper has or will
enter into all contractual arrangements necessary to ensure
transportation of gas to and from the Parking and/or Loan
Point(s).
(f) Facilities. Identification and location
of any facilities to be constructed or installed by any
party which are necessary for receipt of gas by Transporter
or for delivery to and/or utilization of gas by the Shipper
or direct or indirect customers of the Shipper.
(g) Rate. Percentage of the maximum
effective rate under Rate Schedule RTS which Shipper is
willing to pay. Transporter shall not be obligated to
accept any bid or execute a Gas Transportation Contract at
a rate less than the maximum rate allowable under such Rate
Schedule. A request for service at a Negotiated Rate or
under a Negotiated Rate Formula shall specify the
Negotiated Rate or Negotiated Rate Formula on which the
Shipper is willing to agree.