Iroquois Gas Transmission System, L.P.

FIRST REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/04/2005, Docket: RP06- 84-000, Status: Effective

Fifth Revised Sheet No. 50 Fifth Revised Sheet No. 50 : Effective

Superseding: Ourth Revised Sheet No.50

 

 

 

2.30 Zone 1. Zone 1 commences at Transporter's

interconnection with TransCanada PipeLines Limited at the

International border at MP 0 at Waddington, New York, and

extends to Transporter's interconnection with the Tennessee

Gas Pipeline Company at MP 192 at Wright, New York. Any

Receipt Point at Wright, New York, shall be deemed to be

located in the same Zone as the corresponding Delivery

Point to which the transportation service relates. Any

Delivery Point at Wright, New York, shall be deemed to be

located in the same Zone as the corresponding Receipt Point

to which the transportation service relates.

 

2.31 Zone 2. Zone 2 commences at Transporter's

interconnection with the Tennessee Gas Pipeline Company at

MP 192 at Wright, New York, and extends to Transporter's

interconnection with the New York Facilities System at MP

373 at South Commack, New York.

 

2.32 Reserved for future use.

 

2.33 Transporter Overrun Costs. Transporter Overrun

Costs are the costs incurred by Transporter due to

unauthorized Shipper overruns, which costs are not otherwise

included in Transporter's rates. Such costs shall consist

of:

 

(a) Costs incurred by Transporter to correct

the effect of any tampering with or alteration of

Transporter's facilities which permitted an overall overrun

to occur at the affected Delivery Point and the costs

incurred by Transporter to repair such facilities;

 

(b) Costs incurred by Transporter to acquire

additional gas to prevent or alleviate curtailments and to

reestablish appropriate operating pressure on its system;