Iroquois Gas Transmission System, L.P.
FIRST REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2004, Docket: RP04-366-000, Status: Effective
Fifth Revised Sheet No. 15 Fifth Revised Sheet No. 15 : Effective
Superseding: Fourth Revised Sheet No. 15
Rate Schedule RTS (Continued)
Receipt Point during such month for any reason whatsoever
including force majeure.
(b) Transportation Commodity Charge. For each month,
the Transportation Commodity Charge payable by Shipper shall,
subject to any discount as provided herein, be equal to the
applicable Maximum Transportation Rate multiplied by the sum of
the Scheduled Equivalent Quantities nominated by Shipper during
such month.
(c) RESERVED FOR FUTURE USE
(d) ACA Surcharge. For each month, the ACA Surcharge
payable by Shipper shall be equal to the applicable ACA Rate, as
stated on the currently effective Sheet No. 4 of this FERC Gas
Tariff, multiplied by the sum of the Scheduled Equivalent
Quantities nominated by Shipper during such month at each
Delivery Point for transportation from each Receipt Point.
(e) Deferred Asset Surcharge. For each month, the
Deferred Asset Surcharge payable by Shipper shall be equal to
the applicable Deferred Asset Rate for the applicable Zone, as
stated on the currently effective Sheet No. 4 of this FERC Gas
Tariff, multiplied by the sum of the Scheduled Equivalent
Quantities nominated by Shipper during such month. For each
month, the Deferred Asset Intra-Zone and Inter-Zone Rates shall
be applied in the same manner as the Intra-Zone and Inter-Zone
Transportation Rates.
(f) RESERVED FOR FUTURE USE.