Iroquois Gas Transmission System, L.P.
FIRST REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/15/2008, Docket: RP98-18-039, Status: Effective
FIRST REVISED SHEET NO. 6R FIRST REVISED SHEET NO. 6R
Superseding: SUBSTITUTE ORIGINAL SHEET NO. 6R
STATEMENT OF NEGOTIATED RATES 1/, 3/, 4/
Customer Name: KeySpan Energy
Contract Number: 550-14 (1) 550-14 (2) 550-14 (3)
Rate Schedule: RTS RTS RTS
Contract Demand: 95,000 dth 175,000 dth 200,000 dth
(Maximum) (Maximum) (Maximum)
Demand Charge 2/, 6/ $13.6875
Commodity Charge 2/ $0.0000
Primary Receipt Point(s):
Name Brookfield
Primary Delivery Point(s):
Name South Commack, NY
Term of Agreement 5/: 11/1/08 – 1/1/09 – 11/1/09 -
1/1/09 11/1/09 10/31/19
Notes:
1/ Unless otherwise noted, negotiated contracts do not deviate
in any material respect from the applicable form of service
agreement set forth in Iroquois' FERC Gas Tariff
2/ Unless otherwise noted, rates are exclusive of all
surcharges.
3/ Unless otherwise noted, this tariff sheet reflects the
essential elements of the negotiated contracts, including a
specification of all consideration.
4/ Surcharges. Shipper shall be responsible for (i)
Transporter’s Measurement Variance/Fuel Use factor, (ii) the
Deferred Asset Surcharge, and (iii) FERC-prescribed surcharges
of general applicability, including but not limited to the ACA
surcharge, that Transporter may be entitled to charge from time
to time pursuant to Transporter’s FERC Gas Tariff.
(Footnotes continued on Sheet 6S.)