Horizon Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/12/2009, Docket: RP09-856-001, Status: Pending
Substitute First Revised Sheet No. 303 Substitute First Revised Sheet No. 303
Superseding: Original Sheet No. 303
EXHIBIT B
DATED ............
EFFECTIVE ...................
Shipper:
Contract No.:
Delivery Point(s):
MDQ
Name / Location County/Area State PIN No. (Dth)
----------------------------------------------- ----------- ----- ------- ------
PRIMARY DELIVERY POINT(S):
1. ........................................... ........... ..... ....... .....
...........................................
...........................................
...........................................
SECONDARY DELIVERY POINT(S):
2. ........................................... ........... ..... ....... .....
...........................................
...........................................
...........................................
Delivery Pressure, Assumed Atmospheric Pressure
-----------------------------------------------
Natural gas to be delivered by Horizon to Shipper, or for Shipper's account, at the
Delivery Point(s) shall be at the pressures available in Horizon's pipeline facilities
from time to time. The measuring party shall use or cause to be used an assumed
atmospheric pressure corresponding to the elevation at such Delivery Point(s).