Horizon Pipeline Company, L.L.C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2009, Docket: RP09-856-000, Status: Effective

First Revised Sheet No. 303 First Revised Sheet No. 303

Superseding: Original Sheet No. 303

 

EXHIBIT B

DATED ............

EFFECTIVE ...................

 

 

 

Shipper:

 

Contract No.:

 

Delivery Point(s):

 

 

MDQ

Name / Location County/Area State PIN No. (Dth)

----------------------------------------------- ----------- ----- ------- ------

 

PRIMARY DELIVERY POINT(S):

 

1. ........................................... ........... ..... ....... .....

...........................................

...........................................

...........................................

 

 

SECONDARY DELIVERY POINT(S):

 

2. ........................................... ........... ..... ....... .....

...........................................

...........................................

...........................................

 

 

 

Delivery Pressure, Assumed Atmospheric Pressure

-----------------------------------------------

 

Natural gas to be delivered by Horizon to Shipper, or for Shipper's account, at the

Delivery Point(s) shall be at the pressures available in Horizon's pipeline facilities

from time to time. The measuring party shall use or cause to be used an assumed

atmospheric pressure corresponding to the elevation at such Delivery Point(s).