Horizon Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2002, Docket: CP00-129-001, Status: Effective
Original Sheet No. 228 Original Sheet No. 228 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
engineering and operating constraints, and for maintenance of
service at projected levels to all Shippers, consistent with
applicable priorities of service. The Operating Plan may include,
inter alia, a specification of:
(i) Desired levels of flow gas for each
category of Shipper during various periods of the year.
(ii) Plans to deal with specific contingencies
Horizon anticipates may occur during the period covered by the
Operating Plan.
(b) The Operating Plan shall be for planning and
informational purposes only and shall not be binding on Horizon or
on any Shipper. It is further understood that, since all elements
of an Operating Plan are subject to continual change and are
contingent on the actions of numerous Shippers, the Operating Plan
may not necessarily be an accurate depiction of Horizon's system
at any point in time.
(c) Horizon may request that Shippers periodically
provide non-binding estimates of flow patterns and other operating
parameters. Such information may be used by Horizon in
preparation of the Operating Plan or in testing whether an
Operating Plan previously circulated requires revision.
34.4 OPERATIONAL CONTROL SEQUENCE
In the event Horizon's observations or projections
indicate that a situation is or may be developing in which
adequate pressures may not be maintained or the overall
operational integrity of its system (or any portion thereof) could
be threatened, or in the event that such a situation actually
occurs, Horizon is empowered by this Section to take action to
alleviate this situation. In responding to such a situation,
Horizon shall first apply the Advisory Action procedures of
Section 34.5. If such measures are not sufficient to address the
situation fully, Horizon shall next employ Operational Flow Orders
as provided in Section 34.6. In the event Operational Flow Orders
alone are not adequate, Horizon may invoke the Critical Time