Horizon Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/22/2009, Docket: RP09-246-000, Status: Effective
Second Revised Sheet No. 178 Second Revised Sheet No. 178
Superseding: First Revised Sheet No. 178
GENERAL TERMS AND CONDITIONS
----------------------------
(b) The volume in a Qualified Bid may not be less
than the minimum volume required for an Eligible Firm
Transportation Agreement under Horizon's Tariff. Neither the
volume nor the release term specified in a Qualified Bid may
exceed the maximum volume or term specified in a Capacity Release
Request, unless the Capacity Release Request specifically allows
otherwise. A Qualified Bidder must accept all the terms and
conditions of a Capacity Release Request submitted under Section
15.4 (involving a Prearranged Release) except for the level of the
reservation charge and the MDQ, unless the Capacity Release
Request specifically allows otherwise.
(c) For releases of a term of more than one (1) year,
a Qualified Bidder may not bid rates which would exceed Horizon's
maximum reservation charge applicable to the Eligible Firm
Transportation Agreement capacity. If the Original Shipper is
paying a Negotiated Rate or a rate under a Negotiated Rate Formula
pursuant to Section 33 of these General Terms and Conditions, a
Qualified Bidder may not bid a rate which exceeds the applicable
Recourse Rate. The maximum Qualified Bid reservation charge
includes all demand surcharges, including all direct-billed
charges which are or may become applicable to the Eligible Firm
Transportation Agreement capacity.
(d) All Qualified Bids shall provide for payment of
maximum commodity charges under Horizon's Tariff for the capacity
bid, as well as all other applicable add-on charges and surcharges
under Horizon's Tariff, such as, but not limited to, ACA, Fuel Gas
and Unaccounted For Gas.
(e) A Qualified Bid received by Horizon during an
open season shall be posted by Horizon on its Interactive Website
system, without the name of the Qualified Bidder. A Qualified Bid
may be withdrawn by the Qualified Bidder prior to the close of the
open season, but may not be withdrawn thereafter. Following such
withdrawal, the Qualified Bidder cannot bid for the same capacity
during the open season at a lower rate.
(f) All Qualified Bids must be consistent with all
provisions of Horizon's Tariff. Any Qualified Bid inconsistent
with Horizon's Tariff or the applicable Capacity Release Request
shall be null and void.