Horizon Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2002, Docket: CP00-129-001, Status: Effective
Original Sheet No. 122 Original Sheet No. 122 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
efforts to accommodate such load pattern, and will consult with
Shipper in an effort to generally accommodate load variation to
the maximum extent feasible and compatible with the needs of
Shippers as a group. If, after written request by Horizon,
Shipper fails to restrict its hourly takes as specified herein,
Horizon may install and operate a load limiting device at any
Delivery Point where such failure has occurred. The cost for
such device, including the cost of installation, shall be paid
by Shipper within 30 days of its receipt of the bill therefor.
5.5 LOCATION
Unless otherwise described in an Agreement, the
Delivery Point(s) for transportation Agreements shall be
located at the interconnection between the facilities of
Shipper or its designee, and the facilities of Horizon.