Horizon Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2002, Docket: CP00-129-001, Status: Effective
Original Sheet No. 106 Original Sheet No. 106 : Effective
GENERAL TERMS AND CONDITIONS
----------------------------
1.27 SYSTEM
"System" shall mean the pipeline, any compression, and
related facilities owned or leased by Horizon.
1.28 TURNBACK CAPACITY
"Turnback Capacity" shall mean capacity which is
returned to Horizon in response to a direct solicitation from
Horizon to existing Shippers for permanent releases of capacity to
serve an expansion request.
1.29 UNACCOUNTED FOR GAS
"Unaccounted For Gas" shall mean the thermal
equivalent of the difference between the sum of all input volumes
of gas to the System and the sum of all output volumes of gas from
the System, which difference shall include but shall not be
limited to gas vented (other than gas vented pursuant to Section
3.7) and gas lost as a result of an event of Force Majeure, the
ownership of which cannot be reasonably identified, but shall not
include Fuel Gas.
1.30 UNAUTHORIZED OVERRUN GAS
"Unauthorized Overrun Gas" shall mean Overrun Gas not
accepted by Horizon for scheduling pursuant to Section 7 hereof.
1.31 YEAR
"Year" shall mean a period of three hundred sixty-five
(365) consecutive days or three hundred sixty-six (366)
consecutive days if such period includes February 29.