Horizon Pipeline Company, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/18/2002, Docket: CP00-129-001, Status: Effective
Original Sheet No. 30 Original Sheet No. 30 : Effective
RATE SCHEDULE ITS
-----------------
5.2 Shipper shall reimburse Horizon for any Fuel Gas and
Unaccounted For Gas in transporting gas hereunder as provided by
Section 1.9 of the General Terms and Conditions.
5.3 (a) Shipper shall reimburse Horizon within five (5)
days after costs have been incurred by Horizon for all fees
required by the FERC or any regulatory body including, but not
limited to, filing, reporting, and application fees to the extent
such fees are specifically related to service for that Shipper
hereunder and are not generally applicable fees (such as general
rate case filing fees).
(b) If Horizon constructs, acquires or modifies any
facilities to perform service hereunder, then as specified in an
agreement between the parties either:
(1) Shipper shall reimburse Horizon for the cost
of such facilities or facility modifications as described in the
General Terms and Conditions of this Tariff; or
(2) Horizon shall assess a monthly charge
reflecting such facility costs.
5.4 The ACA charge will be assessed, when applicable, as
provided in the General Terms and Conditions of this Tariff, on
volumes received by Horizon from Shipper under this Rate Schedule
ITS.
5.5 (a) Horizon shall have the unilateral right to file
with any appropriate regulatory authority and make changes
effective in: (1) the rates and charges applicable under this
Rate Schedule ITS, including both the level and design of such
rates and charges; or (2) the terms and conditions of this Rate
Schedule ITS. Horizon agrees that Shipper may protest or contest
the aforementioned filings, or may seek authorization from duly
constituted regulatory authorities for such adjustment of
Horizon's existing FERC Gas Tariff as may be found necessary to
assure that its provisions are just and reasonable.