Guardian Pipeline, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/31/2008, Docket: RP09-80-000, Status: Effective
Original Sheet No. 216H Original Sheet No. 216H
GENERAL TERMS AND CONDITIONS
(Continued)
32B. ELECTRIC POWER COST RECOVERY SURCHARGE (Continued)
32B.5 Deferred Electric Power Cost Account
(d) For each month, carrying charges will be calculated on any
positive balance in the Deferred Electric Power Cost
Account at the rate prescribed by the FERC in 18 C.F.R.
Section 154.501(d) and added to such balance.