Guardian Pipeline, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2010, Docket: RP10-926-000, Status: Effective
First Revised Sheet No. 216F First Revised Sheet No. 216F
Superseding: Original Sheet No. 216F
GENERAL TERMS AND CONDITIONS
(Continued)
32B. ELECTRIC POWER COST RECOVERY SURCHARGE
32B.1 General
This section specifies the procedure to be utilized to establish
and adjust the Electric Power Cost Recovery for all firm and
interruptible transportation services rendered in conjunction
with Transporter's applicable Rate Schedules.
Transporter's Electric Power Cost Recovery Surcharge shall be
adjusted for the variance between estimated and actual Electric
Power Costs and for the variance between Estimated and Actual
Volumes on Transporter's system.
32B.2 Filing Procedure
At least thirty (30) days prior to each April 1 and November 1,
which are the beginning dates for each Seasonal Period,
Transporter shall file with the Commission adjustments to reflect
changes in the Electric Power Cost Recovery Surcharge.
32B.3 Definitions
(a) Seasonal Period - The seven-month period beginning each
April 1 and ending each October 31 (summer period), or the
five-month period beginning each November 1 and ending each
March 31 (winter period).
(b) Actual Volumes - Volumes (in dekatherms) over which Transporter
actually collected the Electric Power Cost Surcharge during
the most prior Seasonal Period.