Guardian Pipeline, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2008, Docket: RP08-227-000, Status: Effective
Original Sheet No. 216D Original Sheet No. 216D : Pending
ENERAL TERMS AND CONDTIONS
(Continued)
32A. THIRD PARTY USE GAS ADJUSTMENT
(ii) the portion of the total Third-Party Use Gas Over
Collection or Third-Party Use Gas Under Collection
allocable to Withdrawal Transactions during the
Tracking Period ("Withdrawal Transaction Use Gas
Over/Under Collection") will be calculated as the
product of (1) the Third-Party Use Gas Over Collection
or Third-Party Use Gas Under Collection, as
applicable, during the Tracking Period; and (2) the
Withdrawal Percentage.
(c) Shipper will receive its pro rata share of the Injection
Transaction Use Gas Over/Under Collection based upon the sum
of:
(i) the product of the Injection Transaction Use Gas
Over/Under Collection for the applicable Tracking
Period and Shipper's total Storage Injection Quantity
during the Tracking Period as a percentage of the
total quantity of all Shippers' Injection Transactions
during such Tracking Period; and
(ii) the product of the Injection Transaction Use Gas
Over/Under Collection for the applicable Tracking
Period and Shipper's total LBS Undertake Quantity
during the Tracking Period as a percentage of the
total quantity of all Shippers' Injection Transactions
during such Tracking Period.
(d) Shipper will receive its pro rata share of the Withdrawal
Transaction Use Gas Over/Under Collection based upon the sum
of:
(i) the product of the Withdrawal Transaction Use Gas
Over/Under Collection for the applicable Tracking
Period and Shipper's total Storage Withdrawal Quantity
during the Tracking Period as a percentage of the
total quantity of all Shippers' Withdrawal
Transactions during such Tracking Period; and