Guardian Pipeline, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2002, Docket: RP02-534-000, Status: Effective
Original Sheet No. 165 Original Sheet No. 165 : Superseded
GENERAL TERMS AND CONDITIONS
(Continued)
16. INSTALLATION OF FLOW CONTROL EQUIPMENT
Transporter may elect to construct, install, and operate
flow control equipment at any location on its Pipeline
Facilities whenever it determines that such equipment will
contribute to the safe, reliable, efficient, and orderly
operation of its Pipeline Facilities in a manner that is
consistent with its obligations to provide service under all
of its Rate Schedules.