Guardian Pipeline, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/01/2002, Docket: RP02-534-000, Status: Effective
Original Sheet No. 161 Original Sheet No. 161 : Superseded
GENERAL TERMS AND CONDITIONS
(Continued)
13. DETERMINATION OF RECEIPTS AND DELIVERIES (Continued)
not apply in the case of deliberate omission or
misrepresentation or mutual mistake of fact. Parties'
other statutory or contractual rights shall not
otherwise be diminished by this standard. The
correction shall be made to the month of flow with a
restated line item and a new total quantity of gas for
the specific day(s) and the respective month.