Guardian Pipeline, L.L.C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2008, Docket: RP08-227-000, Status: Effective
Original Sheet No. 43H Original Sheet No. 43H : Pending
RATE SCHEDULE LBS (Continued)
LOAD BALANCING SERVICE
6. THIRD-PARTY TRANSPORTATION USE GAS AND THIRD-PARTY INJECTION USE GAS
6.1 Shipper shall provide in-kind reimbursement of Third-Party
Transportation Use Gas and Third-Party Injection Use Gas, as
applicable, for all LBS Undertake Quantities and LBS Overtake
Quantities. Specifically, Shipper shall be responsible for Third-
Party Transportation Use Gas and Third-Party Injection Use Gas
associated with all of Shipper's LBS Undertake Quantities.
Shipper shall be responsible for Third-Party Transportation Use
Gas associated with all of Shipper's LBS Overtake Quantities.
6.2 On any Day, Shipper's LBS Undertake Quantity may not exceed
Shipper's LBS Undertake MDQ. Third-Party Transportation Use Gas
and Third-Party Injection Use Gas will be deducted from Shipper's
LBS Undertake Quantity.
6.3 On any Day, Shipper's LBS Overtake Quantity may not exceed
Shipper's LBS Overtake MDQ. Third-Party Transportation Use Gas
will be deducted from Shipper's LBS Overtake Quantity.
6.4 Shipper will not be permitted to net the quantity of Third-Party
Transportation Use Gas or Third-Party Injection Use Gas for which
Shipper would otherwise be responsible on any Day if Shipper
utilizes both LBS Undertake Quantities and LBS Overtake Quantities
at different nomination cycles within the Day.
6.5 Shipper's LBS Account balance will be credited or reduced, as
applicable, on a quarterly basis pursuant to Section 32A of the
GT&C of Transporter's Tariff to reflect the Third-Party Use Gas
Adjustment.
7. BILLING AND PAYMENT
The monthly bill for Natural Gas storage under this Rate Schedule shall
be equal to the sum of the charges set forth in Section 5 of this Rate
Schedule and pursuant to Section 8 of the GT&C.
8. DETERMINATION OF RECEIPTS AND DELIVERIES
Receipts and deliveries of Natural Gas under this Rate Schedule LBS
shall be determined in accordance with the provisions of Section 13 of
the GT&C.