Great Lakes Gas Transport, L.L.C.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 06/01/1997, Docket: RP97-157-004, Status: Effective
Second Revised Sheet No. 119 Second Revised Sheet No. 119 : Effective
Superseding: First Revised Sheet No. 119
GENERAL TERMS AND CONDITIONS
FOR TRANSPORTATION SERVICE
(cont'd)
10. CAPACITY ALLOCATION (cont'd)
Where the Existing Shipper has specified that volumetric
bids or bids based upon other variants of the rates applicable to
the capacity to be released will be accepted, any bid which has
more than the one-hundred percent (100%) load factor derivative
of the maximum rates applicable to the capacity to be released
shall be deemed to be a bid offering to pay rates in excess of
Transporter's applicable maximum rates.
Potential Shippers may revise their bids during the posting
period. Potential Shippers may not submit multiple bids for the
same package of capacity. A Prearranged Shipper may match the
"best bid" received by Transporter during the posting period
between 2:00 p.m. and 3:00 p.m., central clock time, on the last
day of the posting period.
(c) Bids are binding until written or electronic notice of withdrawal
is received by Transporter. Bids cannot be withdrawn after the
bid period ends. Following the withdrawal of a bid, a Potential
Shipper may not submit a bid lower than the bid withdrawn during
the remainder of the posting period. For this purpose, bids will
be determined to be "higher" or "lower" than the withdrawn bid by
application of the standard applicable to the determination of
best bid, as set forth in Section 10.5.
10.5 Determination of Best Bid
(a) Upon the conclusion of the posting period, Transporter shall de-
termine the "best bid" for the capacity described in an Existing
Shipper's Notice by applying the standard described by the Exist-
ing Shipper pursuant to Subsection 10.2(a)(x) hereof, or, if no
standard was so described, Transporter shall make such determi-
nations according to which bid would generate the revenue stream
with the greatest net present value, without assuming any
throughput, applying as the discount rate the rate under Section
154.501(d) of the Commission's Regulations. Transporter is re-
quired to meet the capacity release timelines for processing
capacity reallocations only if the Existing Shipper's best bid
methodology is either (1) highest rate, (ii) net revenue, or
(iii) present value. Other choices of bid evaluation methodology
(including other releasing shipper defined evaluation methodo-
logies) can be accorded similar timeline evaluation treatment at