Great Lakes Gas Transport, L.L.C.
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/1998, Docket: RP98- 82-000, Status: Effective
Second Revised Sheet No. 13 Second Revised Sheet No. 13 : Effective
Superseding: First Revised Sheet No. 13
EFT RATE SCHEDULE
Enhanced Firm Transportation Service
(cont'd)
8. OPERATING PROTOCOL FOR EFT SERVICE (cont'd)
8.2 Delivery Pressure Requirements
Transporter shall deliver natural gas to Shipper at the point(s)
of delivery at the pressures sufficient to effect deliveries of gas to
Shipper, provided, however, that Transporter shall not be obligated to
deliver gas at pressures greater than the delivery pressure obliga-
tions stated in this Section 8.2, subject to any provisions in this
tariff which may limit these obligations.
Meter Location (psig)
GTI-1 Wood County, W. Va. 200
GTI-2 Wood County, W. Va. 305
River Washington County, Ohio 165
8. OPERATING PROTOCOL FOR EFT SERVICE (cont'd)
8.3 Receipt Requirements
(a) At the following delivery points to Transporter, requirements are
served by upstream pipeline connections which feed directly to
the Shipper's market. In these specific cases, Transporter has
no facilities through which to replace or supplement natural gas
deliveries, and the Shipper is restricted to the pressures and
quantities available from such upstream pipelines, with whom
Transporter will contract directly for transportation service.
Transporter's delivery obligation at such points will also be
limited by station capacities, which are listed below.
Interconnecting
Pipeline Meter Name/Location Meter PSIG Mcf/d
Columbia Rockport/Wood County, W. Va. 940 325 25,743
Local
Production
------- Ohio/Washington County, Ohio 117 25 2,036
------- Limestone/Wood County, W. Va. 203 310 5,000
------- Pond Creek/Wirt County, W. Va. 999 60 1,080
------- Silverton/Jackson County, W. Va. --- 55 268
------- Cottageville/Jackson County, W. Va. 5631 45 5,049