Great Lakes Gas Transmission Limited Partner
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/30/2009, Docket: RP10-100-000, Status: Effective
Fourth Revised Sheet No. 42B Fourth Revised Sheet No. 42B
Superseding: Third Revised Sheet No. 42B
GENERAL TERMS AND CONDITIONS
----------------------------
(continued)
15.15 (continued)
(D) All bids will be open for viewing through GLConnect except that the identity of the bidder
will remain confidential during the open season. To be considered under this subsection,
bids must be: (1) received during an open season; (2) in writing, posted to GLConnect, or
submitted through EDI; and (3) must conform with the provisions of Section 2 of the
General Terms and Conditions of Transporter's FERC Gas Tariff, Second Revised Volume No. 1
and the Releasing Shipper's Subsection 15.15(A) requirements set forth in the capacity
release notice. Additionally, the potential Replacement Shipper must provide Transporter
with its Dun & Bradstreet Number.
(E) Bids shall be binding until written or electronic notice is received by Transporter. Bids,
however, cannot be withdrawn once the bid period ends.
(F) At the close of the open season, one of the following will occur:
(1) In the event that a bid is not received by Transporter for the Capacity, Transporter
shall so notify Releasing Shipper. A request by Releasing Shipper to solicit
additional bids shall be treated as a new request under Subsection 15.15(A).
(2) If one bid is received (bids must meet Subsection 15.15(A) requirements in order to be
valid), then Transporter will contract with the bidder if the bidder complies with
Subsection 15.10 and will implement the capacity release pursuant to Subsection
15.15(B) above. Transporter shall so notify Releasing Shipper.