Great Lakes Gas Transmission Limited Partner
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/30/2009, Docket: RP10-100-000, Status: Effective
Fourth Revised Sheet No. 9A Fourth Revised Sheet No. 9A
Superseding: Third Revised Sheet No. 9A
GENERAL TERMS AND CONDITIONS
____________________________
(continued)
2. REQUEST FOR SERVICE
2.1 Requests
a) In order to be considered for firm (Rate Schedule FT), expedited firm (Rate Schedule EFT),
limited firm (Rate Schedule LFT), and interruptible (Rate Schedule IT) Transportation
Services or Market Center Service (Rate Schedule MC) under this FERC Gas Tariff Second
Revised Volume No. 1, a potential Shipper shall submit to Transporter a Service Request Form
("Request"), as shown separately in this tariff. Requests shall be sent to:
Great Lakes Gas Transmission Company
717 Texas Street
Houston, TX 77002-2761
Attn: Commercial Services
b) In circumstances where Transporter already possesses the static information, e.g., address,
contacts, etc., for a Shipper and where the variable information, e.g., MDQ, term, etc., is
provided through other reliable sources, e.g., a bid for Transportation Service, Shipper
shall not be required to provide all or a portion of the information included in such
Request. It will, however, be the responsibility of Shipper to notify Transporter of any
changes to the information already in Transporter's possession.
c) Transporter shall evaluate and respond to each Request. If the Request has not provided all
required information, Transporter will send a deficiency letter within fifteen (15) Days of
Transporter's receipt of the request specifying the additional information needed before the
Request can be evaluated. The Request shall be null and void if Shipper fails to furnish the
additional information within fifteen (15) Days of the date of the deficiency letter.
Transporter may, on a not unduly discriminatory basis, exercise its right to extend the
period within which Shipper must furnish the additional information. If the request is
deemed valid the response to Shipper will be within thirty (30) Days of Transporter's receipt
of the Request pursuant to Section 2.1(f) below.
d) Unless Shipper has an established credit history with Transporter or the Request represents a
change to an existing service, each Request under Rate Schedule FT, Rate Schedule EFT, and
Rate Schedule LFT to this FERC Gas Tariff, Second Revised Volume No. 1 shall be accompanied
by a certified or cashier's check payable to Transporter in an amount equal to the lesser of
$10,000 or the first three Months of the applicable Reservation Fees, which amount shall be
applied, until fully used, against the first amounts due by Shipper to Transporter as
reservation and utilization fees. Transporter may, on a not unduly discriminatory basis,
exercise its right to waive such amount as unnecessary to ensure Shipper's future transport
on Transporter's system. If Transporter and Shipper do not execute an Agreement within the
time period provided in Section 2.1(f), such amount, including any interest that will accrue
at the rate set forth in Section 154.501 of the Commission's Regulations, shall be returned
to Shipper.