Mobile Bay Pipeline Company
Second Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/01/1994, Docket: GT94- 18-000, Status: Effective
Original Sheet No. 207 Original Sheet No. 207 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
(i) Shipper must provide Transporter with all information required
for Transporter to comply with the Commission's reporting
regulations.
(j) Transporter shall not be required to perform service on behalf of
any Shipper that fails to comply with any and all of the terms of
the applicable rate schedule, Service Agreement and the General
Terms and Conditions.
(k) Transporter shall deliver gas at each delivery point to or for
the account of Shipper at the pressure which shall be available
from time to time in Transporter's pipeline after required
measurement, flow control, and/or regulation.
(l) Impairment of Deliveries - Service may be interrupted or
curtailed for reasons of force majeure or due to any other
scheduled routine repair, and maintenance to be reasonably
determined by Transporter, and Transporter shall give Shipper
notice where practical of such interruption or curtailment.
Without limitation of the foregoing, Shipper shall have the right
to equitably reduce receipts or deliveries of natural gas on any
day below the MDQ to permit maintenance, repair, overhaul,
replacement, or construction of pipelines, compressors, metering,
regulating, or other production, gathering, and transmission
facilities and equipment or due to facility maintenance or freeze
offs.
In the event on any day Transporter is unable to receive for
transportation or deliver the total MDQ of any Shipper receiving
service under Rate Schedule FTS, then the system capacity which
is available for firm transportation shall be in accordance with
the priorities set out in Section 19 hereof.