Southeast Supply Header, LLC
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/04/2008, Docket: CP07-44-005, Status: Effective
Original Sheet No. 252 Original Sheet No. 252
GENERAL TERMS AND CONDITIONS
(CONTINUED)
9. BILLING
9.1 Transporter shall render an invoice(s) to Shipper for each Month
for (i) all Transportation Services provided pursuant to this
Tariff during the preceding Month; and (ii) any other charges for
which Shipper is liable under the Tariff or Shipper's other
obligations. Such invoice shall be delivered to Shipper or its
agent by posting Shipper's final invoice on Transporter's LINK®
System and posting a general notice of the availability of the
final invoices on Transporter's Informational Postings Web site.
Transporter will provide an e-mail notification, if an e-mail
address has been designated by Shipper, contemporaneously with
the posting of the final invoice on Transporter's LINK® System.
It is the Shipper's responsibility to furnish to Transporter e-
mail address information for receipt of invoices and to update
such e-mail information as necessary. Shipper may designate an
agent to receive invoices and may designate such agent to receive
the e-mail notifications of the availability of Shipper's final
invoice on Transporter's LINK® System.
9.2 The Imbalance Statement shall be rendered prior to or with the
Transportation invoice(s), and the Transportation invoice(s)
shall be prepared on or before the 9th Business Day after the end
of the Service Month. Rendered is defined as postmarked, time-
stamped, and delivered to the designated site or designated as
approved or final on the LINK® System. Prior Period Adjustment
time limits shall be 6 Months from the date of the initial
Transportation invoice(s) with a 3-Month rebuttal period,
excluding government-required rate changes. This standard shall
not apply in the case of deliberate omission or misrepresentation
or mutual mistake of fact. Parties' other statutory or
contractual rights shall not otherwise be diminished by this
standard. Prior Period Adjustments shall be reported by
production date, but do not have to be invoiced separately by
production Month nor is each production Month a separate paper
invoice page.