Florida Gas Transmission Company, LLC

Fourth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2006, Docket: RP06-463-000, Status: Effective

Original Sheet No. 212 Original Sheet No. 212 : Effective

 

GENERAL TERMS AND CONDITIONS

(continued)

 

5. MEASURING EQUIPMENT

 

a. Installation and Operation. The Transporter will install,

maintain and operate, at its own expense except as provided in

Section 21 hereof at or near each point of delivery, a meter or

meters and other necessary measuring equipment by which the volume

of gas delivered to the Shipper shall be measured.

 

b. Check Measuring Equipment. The Shipper may install, maintain and

operate such check measuring equipment as it shall desire,

provided that such equipment shall be so installed as not to

interfere with the operation of the Transporter's measuring

equipment at or near the point of delivery. Upon notice to

Shipper, Transporter shall have access to such check measuring

equipment at all reasonable hours, but the reading, calibrating

and adjusting thereof and the changing of charts shall be done

only by the Shipper.

 

c. Access to Equipment and Records. Both the Transporter and the

Shipper shall be notified and shall have the right to be present

at the time of any installing, reading, cleaning, changing,

repairing, inspecting, calibrating or adjusting done in connection

with the other's measuring equipment used in measuring deliveries

hereunder. Delivery Point Operator shall have the right to access

Transporter's remote flow calculation, and shall have the right to

install equipment at its own expense which enables such Delivery

Point Operator to access Transporter's remote flow calculation for

its own use, provided that the installation of said equipment does

not interfere with Transporter's equipment. The records from such

measuring equipment shall remain the property of the owner, who

upon request will submit to the other such records and charts,

together with calculations therefrom, for the other's inspection

and verification, subject to return within ten (10) days after

receipt thereof.

 

d. Care in Installation. All installations of measuring equipment,

applying to or affecting deliveries of gas, shall be made in such

manner as to permit an accurate determination of the volume of gas

delivered and ready verification of the accuracy of measurement.

Reasonable care shall be exercised by both the Transporter and the

Shipper in the installation, maintenance and operation of pressure

regulating equipment so as to avoid, so far as practicable, any

inaccuracy in the determination of the volume of gas delivered

hereunder.