Equitrans, L. P.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/16/2009, Docket: RP09-363-000, Status: Effective
First Revised Sheet No. 276D First Revised Sheet No. 276D
Superseding: Substitute Original Sheet No. 276D
GENERAL TERMS AND CONDITIONS (Continued)
(iii) The maximum rate(s) Bidder is willing to pay for
the capacity. If the capacity release is for more than
one year, the rate may not exceed the maximum
tariff rate for the applicable service set forth in
Equitrans' FERC Gas Tariff, as may be changed from
time to time. This maximum tariff rate limitation
shall not apply to releases of capacity for a period
of one year or less in duration if the release is to
take effect on or before one year from the date on
which Equitrans is notified of the release.
(iv) The quantity desired;