Equitrans, L. P.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/16/2010, Docket: RP10-616-000, Status: Effective
Second Revised Sheet No. 273 Second Revised Sheet No. 273
Superseding: First Revised Sheet No. 273
GENERAL TERMS AND CONDITIONS (Continued)
(ii) The Replacement Customer must have separately arranged for
transportation of storage quantities to and from storage on
the Equitrans system before a release of storage
entitlements can take effect.
(iii) All applicable terms and conditions of service, including
ratcheting and cycling requirements and associated
penalties, will apply to the storage entitlements held by
the Releasing and Replacement Customer, respectively, on the
date that the particular term or condition of service is
applied.
(iv) A Releasing Customer that releases storage capacity may
include conditions relating to the sale and/or repurchase of
gas in storage inventory. This exemption to the prohibition
on tying for releases of storage capacity applies to both
releases subject to an asset management arrangement, as
defined by 18 C.F.R. § 284.8(h)(3), and releases not subject
to an asset management arrangement.
22.5 Notice to Equitrans by Releasing Customer. A Releasing Customer
that wishes to release capacity shall notify Equitrans through
Equitrans' EBB System or EDI that it elects to release firm
capacity. The notice shall set forth the following information:
(i) Releasing Customer's name and the name and title of
the individual authorizing the release of capacity;
(ii) Service agreement number;
(iii) Whether the release is on a permanent or temporary basis;
(iv) Whether the release is on a recallable or non-recallable
basis, and if recallable, the conditions of recall and
whether the capacity must be returned to Replacement
Customer after a recall has ended. Reput method and
rights shall be specified at the time of the deal. Reput
method and rights are individually negotiated between the
Releasing Customer and Replacement Customer;
(v) The maximum and minimum numeric quantity of the firm
capacity which the Releasing Customer desires to
release on a per day basis for transportation, storage
injection, storage withdrawal, and a per-release quantity
for storage capacity and total release period quantity;
(vi) The primary points of receipt and delivery at which
the Releasing Customer will release the capacity and the
capacity to be released at each point;