Equitrans, L. P.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 05/16/2010, Docket: RP10-616-000, Status: Effective
Second Revised Sheet No. 38 Second Revised Sheet No. 38
Superseding: First Revised Sheet No. 38
RATE SCHEDULE 115SS
115 DAY STORAGE SERVICE (Continued)
(ii) Both the transferee and the transferor of the stored quantity
provide Equitrans with verification of the transfer through
Equitrans' EBB System. The verification will include the
identity of the transferee and the transferor, the Storage
Service Agreements between which the transfer is made, and the
quantity of gas transferred;
(iii) The transfer does not cause any party to be in violation of
any requirement of Rate Schedule 115SS;
(iv) The transfer can be accomplished within the operating
restrictions of Equitrans' storage fields, and does not
require the issuance of an Operational Flow Order either to
move transferred quantities between individual storage fields
or to deliver transferred quantities to the transferee; and
(v) The transferee has existing arrangements for the
transportation of storage quantities to and from storage on
the Equitrans system.
(b) Based on the verification received, Equitrans will determine the
revised ratcheting and cycling requirement for the transferor and
transferee, as appropriate, and will post acknowledgement of the
transfer on Equitrans' EBB System within one (1) business day after
receiving verification in accordance with Section 8 of this Rate
Schedule. Transferor and transferee may nominate injections and
withdrawals thereafter in accordance with Section 8 of the General
Terms and Conditions of Equitrans'FERC Gas Tariff.
9. GENERAL TERMS AND CONDITIONS
The General Terms and Conditions of Equitrans' FERC Gas Tariff are
applicable to this Rate Schedule where not inconsistent with the
provisions contained herein.