El Paso Natural Gas Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1993, Docket: RS92- 60-011, Status: Effective
2nd Substitute Original Sheet No. 290 2nd Substitute Original Sheet No. 290 : Superseded
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
28. CAPACITY RELEASE PROGRAM (Continued)
28.10 Awarding of Released Capacity (Continued)
(b) If a bid is received that exceeds the minimum but does not
conform completely to the reservation charge(s) and
reservation surcharge(s) and all the terms and conditions
specified in the Releasing Shipper's notice, then the
Acquiring Shipper(s) shall be the Bidding Shipper(s) who
offer(s) the highest bid determined under Option 1, Option
2, Option 3 or Option 4 below, as applicable. Provided,
however, if such bid was submitted as a bid in an open
season relating to a pre-arranged release and the
Pre-Arranged Shipper matches such offer, then the capacity
shall be awarded pursuant to Section 28.10(g) hereof. If
bids from two or more Bidding Shippers result in bids of
equal rank then the capacity shall be awarded in
accordance with Section 28.10(f) hereof. El Paso shall
evaluate and rank all bids submitted during the open
season. If Bidding Shipper has not removed its
contingency by the date specified by the Releasing Shipper
pursuant to Section 28.4(p) hereof, such bid shall be
deemed to have been withdrawn.
(i) Default Bid Evaluation Criteria - If Releasing
Shipper does not specify otherwise, all bids will be
evaluated pursuant to Option 1 with equal weighting
factors on all three criteria.