El Paso Natural Gas Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/1991, Docket: RP88- 44-019, Status: Effective
Original Sheet No. 271 Original Sheet No. 271 : Superseded
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
26. CONTRACT STORAGE SERVICE (Continued)
shall post the availability of storage on its electronic
bulletin board. In order for a Shipper to participate in this
open season, Shipper shall submit to El Paso a completed
Contract Storage Service Request Form in the form set forth in
Section 26.10 below.
If Shippers' requests for storage capacity exceed the firm
capacity available during the open season, such capacity shall
be allocated among the requesting Shippers on a pro-rata basis.
After the open season, El Paso will allocate all requests for
future available capacity on a first-come/first-served basis.
26.6 Priority of Service - The injection and withdrawal capability of
the storage facility which will be available under this FERC Gas
Tariff each day will be that injection and withdrawal capability
which remains after El Paso makes injections or withdrawals
necessary for load equation, load balancing and system
management. El Paso will determine each day whether the
Washington Ranch Storage Facility is in injection or withdrawal
mode. Shippers desiring the injection or withdrawal mode
indicated by El Paso may request storage service on that day.
El Paso retains the right to limit or deny injections and
withdrawals for contract storage Shippers on any given day that
it is determined that the Washington Ranch Storage Facility is
needed by El Paso to maintain the safe and efficient operation
of its system and the reliability of its service to all Shippers.
26.7 Firm Storage - Requests for firm storage hereunder shall be
accompanied by a prepayment, not to exceed $10,000.00, of the
total Reservation Charges provided by Section 4 of Rate Schedule
CSF of this FERC Gas Tariff.
26.8 Affiliate Transactions - El Paso shall comply with the
requirements of Order Nos. 497 and 497-A for contract storage
service.
26.9 Reporting Requirements - El Paso shall file with the Commission
within 30 days of the end of each complete storage
injection/withdrawal cycle a report of storage activity to
include the following: