El Paso Natural Gas Company

First Revised Volume No. 1-A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/1991, Docket: RP88- 44-019, Status: Effective

First Revised Sheet No. 207 First Revised Sheet No. 207 : Superseded

Superseding: Original Sheet No. 207

TRANSPORTATION GENERAL TERMS AND CONDITIONS

(Continued)

 

3. MEASUREMENT EQUIPMENT (Continued)

 

3.6 Correction of Metering Errors - (Continued)

 

If, upon test, the measuring equipment shall be found to be

inaccurate by an amount exceeding two percent (2%), at a

recording corresponding to the average hourly rate of flow for

the period since the last preceding test, then any previous

recordings of such equipment shall be corrected to zero error

for any period that is known definitely or agreed upon. In

case the period is not known or agreed upon, such correction

shall be for a period equal to the lesser of one-half of the

time elapsed since the date of the last test or sixteen (l6)

days.

 

3.7 Failure of Meters - In the event a meter is out of service or

registering inaccurately, the quantity of gas delivered shall

be determined:

 

(i) By correcting the error if the percentage of error

is ascertainable by calibration, test or

mathematical calculations; or in the absence of (i),

then

 

(ii) By using the registration of any check meter or

meters, if installed and accurately registering; or

in the absence of both (i) and (ii), then

 

(iii) By estimating the quantity of delivery during

periods under similar conditions when the meter was

registering accurately.

 

3.8 Right-of-Way and Rural Consumers - El Paso shall install,

maintain and operate at its own expense, all main line taps

and high-pressure regulators necessary for the delivery of

natural gas by El Paso to Shipper for resale to right-of-way

consumers as well as to rural consumers situated remotely from

Shipper's general distribution system. For measurement of gas

delivered by El Paso to Shipper for resale to such

right-of-way consumers, Shipper shall install, maintain and

operate at Shipper's own expense, adjacent to El Paso's

pipeline, the meters, low-pressure regulators and other

equipment required.