El Paso Natural Gas Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/01/1991, Docket: RP88- 44-038, Status: Effective
Original Sheet No. 127A Original Sheet No. 127A : Superseded
RATE SCHEDULE FTS-S
Firm Transportation Service
(Continued)
3. RATE (Continued)
3.3 Production Area Charges (Continued)
independent field inspections, verifies that the dehydrator is
not operating, then the Shipper either shall install and pay
for real time measurement and communication equipment enabling
El Paso to monitor continuously such source or, at Shipper's
election, shall pay the dehydration charge for all gas
received by El Paso from that source. In the event
conformance gas is processed at an extraction plant or other
facility operated by a third party,
(This space intentionally left blank)