El Paso Natural Gas Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/1993, Docket: RS92- 60-016, Status: Effective
Third Revised Sheet No. 115 Third Revised Sheet No. 115 : Superseded
Superseding: Substitute Second Revised Sheet No. 115
RATE SCHEDULE T-3
Firm Transportation Service
(Continued)
4. RATE (Continued)
El Paso, at its sole discretion, may from time to time and at
any time selectively adjust any or all of the rates stated above
applicable to any individual Shipper; provided, however, that such
adjusted rate(s) shall not exceed the applicable Maximum Rate(s)
nor shall they be less than the Minimum Rate(s) set forth on Sheet
Nos. 21 and 22 of this Volume No. 1-A Tariff, or superseding
tariff. If El Paso so adjusts any rates to any Shipper, El Paso
shall file with the Federal Energy Regulatory Commission any and
all required reports respecting such adjusted rates.
5. MINIMUM MONTHLY BILL
The Reservation Charge(s) for the month.
6. SCHEDULED OVERRUN TRANSPORTATION
Upon request of Shipper, El Paso, at its reasonable
discretion, may receive, transport and deliver natural gas in
excess of Shipper's Transportation Contract Demand specified in the
executed Transportation Service Agreement. Payments and fuel for
any excess quantity shall be equivalent to the maximum "Mainline
Transportation Charge" applicable from the production basin(s) in
which the natural gas is received to the production area(s) within
such basin or state(s) in which deliveries are made for service
under El Paso's Rate Schedule T-1, as such rate is in effect and
reflected from time to time on Sheet No. 20 of this Volume No. 1-A
Tariff, or superseding tariff.
7. FUEL AND/OR SHRINKAGE
In addition to the payments made pursuant to Section 4 of this
Rate Schedule, Shipper shall provide fuel and be responsible for
shrinkage that occurs in transporting natural gas and rendering