RATE SCHEDULE T-3
Firm Transportation Service
(Continued)
4. RATE (Continued)
4.3 Production Area Charges (Continued)
apply effective the first day of the following calendar month
after El Paso receives such notice. Additionally, if the
purification and/or products extraction charge(s) are
applicable but such test results demonstrate that the gas is
being dehydrated to conform to said Section 5.1, then no
dehydration charge shall apply. However, if El Paso, through
independent field inspections, verifies that the dehydrator is
not operating, then the Shipper either shall install and pay
for real time measurement and communication equipment enabling
El Paso to monitor continuously such source or, at Shipper's
election, shall pay the dehydration charge for all gas
received by El Paso from that source. In the event
conformance gas is processed at an extraction plant or other
facility operated by a third party, Shipper shall pay any
charge assessed against Shipper's conformance gas by such
third party in accordance with the provisions of this
paragraph. If there is insufficient capacity available at any
production area service facility for all gas scheduled for
such facility, then conformance and non-conformance gas shall
be curtailed pro rata on a non-discriminatory basis based on
Shipper's scheduled conformance and non-conformance gas to the
total scheduled gas.
For the purpose of computing the Reservation Charges specified
herein, if Shipper's Transportation Contract Demand or Maximum
Daily Quantity is expressed in Mcf, it shall be converted to dth's
by multiplying the number of Mcf by the heating value conversion
factor of 1.030 which is the factor utilized in designing such
charges.