El Paso Natural Gas Company
First Revised Volume No. 1-A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/1994, Docket: RP95- 13-000, Status: Effective
Sub Twenty-First Revised Sheet No. 21 Sub Twenty-First Revised Sheet No. 21 : Superseded
Superseding: Sub Twentieth Revised Sheet No. 21
STATEMENT OF RATES FOR
TRANSPORTATION OF NATURAL GAS AND OTHER RELATED SERVICES
(Rates per dth)
Rate Schedule and Type of Service
RATE SCHEDULE T-3
Transportation Charges Reservation Charge
Maximum Rate Minimum Rate
1. Transportation:
A. Shorthaul $ 3.47797 $ 0.00000
B. Production Area $ 3.47797 $ 0.00000
C. Texas $ 3.80947 $ 0.00000
D. New Mexico $ 4.41909 $ 0.00000
E. Arizona $ 5.57462 $ 0.00000
F. Nevada $ 8.02372 $ 0.00000
G. California $ 9.17080 $ 0.00000
2. Washington Ranch Surcharge (See Sheet Nos. 25 and 26) $ 0.00000
3. A. GRI Surcharge - High Load Factor 1/ $ .2180 $ 0.0000
B. GRI Surcharge - Low Load Factor 1/ $ .1340 $ 0.0000
Usage Charge
Maximum Rate Minimum Rate
Mainline Transportation
1. From San Juan Basin to:
A. Production Area - San Juan $ .0238 $ .0028
B. Texas $ .0238 $ .0028
C. New Mexico $ .0239 $ .0029
D. Arizona $ .0250 $ .0041
E. Nevada $ .0258 $ .0048
F. California $ .0258 $ .0048
2. From Permian Basin to:
A. Production Area - Permian $ .0238 $ .0028
B. Texas $ .0244 $ .0035
C. New Mexico $ .0250 $ .0040
D. Arizona $ .0262 $ .0053
E. Nevada $ .0273 $ .0063
F. California $ .0272 $ .0062
3. From Anadarko Basin to:
A. Production Area - Anadarko $ .0238 $ .0028
B. Texas $ .0241 $ .0031
C. New Mexico $ .0262 $ .0053
D. Arizona $ .0277 $ .0067
E. Nevada $ .0284 $ .0074
F. California $ .0283 $ .0074
4. Mainline Shorthaul $ .0238 $ .0028
5. Mainline Backhaul (Rate identified in 1, 2, 3 or 4 above applicable to the particular
receipt and delivery points involved)
6. GRI Surcharge 1/ $ .0085 $ .0000
7. ACA Surcharge 2/ $ .0025 N/A
8. Take-or-Pay Surcharge 3/ $ .0358 $ .0000
_______________________
1/ See Section 18 of the General Terms and Conditions of this Tariff. The GRI reservation
surcharge is multiplied by Shipper's Transportation Contract Demand or Billing
Determinant. The GRI Usage surcharge is multiplied by Shipper's monthly throughput.
2/ See Section 21 of the General Terms and Conditions of this Tariff.
3/ See Section 22 of the General Terms and Conditions of this Tariff.