El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
First Revised Sheet No. 317 First Revised Sheet No. 317
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
13. FUEL AND L&U (Continued)
13.4 (Continued)
(c) Interruptible Storage Service Fuel - Fuel will be assessed on
quantities of gas injected into Washington Ranch related to
storing gas for Shippers using this service. A description of
this fuel component is found in Section 13.5.
(d) For transportation services where no Fuel is consumed, Fuel
will not be assessed and such transportation quantities shall
not be included in the calculation of mainline quantities when
the entire transportation service is provided using the no-fuel
segments identified below.
(i) Topock to Franconia Junction
(ii) Franconia Junction to Ash Fork
(iii) Ash Fork to Valve City
(iv) Ehrenberg to Wenden
(v) Wenden to Franconia Junction
(vi) North Phoenix to Ash Fork
(vii) Valve City to Ignacio (except Blanco and Rio Vista
receipts)
(viii)Plains to Valve City
(ix) Casa Grande to Cornudas
(x) Cornudas to Plains (by way of Guadalupe, Pecos River and
Eunice)
(xi) Virtual Area routes:
(1) Guadalupe to Wink
(2) Pecos River to Keystone
(3) Keystone to Goldsmith
(4) Wink to Keystone
(5) Waha to Terrell
(6) Goldsmith to Ector
(xii) Transactions where the receipt and delivery point are in
the same plant or meter yard and do not require
compression (example: PG&E Topock to SOCAL Topock).
(e) Transporter shall not assess or collect a fuel reimbursement
from a Shipper when the entire transportation service is
provided using the DAGMOJ to Ehrenberg segment using Line 1903
since Fuel is not consumed. However, shippers using this
segment will be subject to the applicable EPNG and Mojave L&U
charges.