El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
First Revised Sheet No. 306 First Revised Sheet No. 306
Superseding: Original Sheet No. 306
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
11. SYSTEM OPERATIONAL PARAMETERS
11.1Strained and Critial Operating Condition Procedures (Continued)
(e) (ii) After the SOC or COC is lifted, Transporter will post on the
EBB a review of the event requiring the issuance of the
SOC/COC and the actions that were taken to resolve the SOC/COC
event. This review will include, but not be limited to:
(A) duration of SOC/COC;
(B) areas/parties affected by the SOC/COC;
(C) applicable operating conditions including, but not limited
to, Washington Ranch withdrawals/injections and inventory
levels;
(D) actions taken by Transporter and known to be taken by
Shippers that remedied the event requiring the issuance of
the SOC/COC.
(f) Transporter may use Flow Control pursuant to the conditions and
application set forth in Section 11.2 of the GT&C.