TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
11. SYSTEM OPERATIONAL PARAMETERS
11.1Strained and Critial Operating Condition Procedures (Continued)
(a) Strained Operating Condition (Continued)
(ii) Without limitation of Transporter's exercise of its
reasonable judgment to determine whether and the extent to
which it will issue an SOC at any time, Transporter will
either declare an SOC under the following circumstances or,
if in the exercise of Transporter's reasonable judgment it
does not declare an SOC under any of these circumstances,
Transporter shall explain its reasons for not issuing an SOC
by EBB posting within the next Business Day.
(A) when the average of six consecutive hours of the Gas Day
for total system linepack falls below 7000 MMcf and
Washington Ranch is on maximum (operationally) available
withdrawal;
(B) when the average of six consecutive hours of the Gas Day
for total system linepack exceeds 7900 MMcf and
Washington Ranch is on maximum (operationally) available
injection.
(iii) An SOC will be declared for a specific Shipper(s) and/or a
specific location(s) if they can be identified, and a
specific direction (i.e., Pack or Draft). If a specific
shipper or location SOC is not appropriate, the SOC will be
declared for the North System, the South System, or the
entire system. Such notice will be provided using the
notification procedures of Section 6.1(a)(xii) of the GT&C.
(iv) Notification of an SOC declaration shall include
identification of linepack status and whether the SOC is a
Pack SOC or a Draft SOC.
(A) A "Pack" designation shall be applied to flow variances
that exacerbate a high linepack condition (e.g.
undertakes from Transporter at a Delivery Point(s)). A
"Draft" designation shall be applied to flow variances
that exacerbate a low linepack condition (e.g.
overtakes from Transporter at a Delivery Point(s)).
(B) A "Pack" designation shall be applied to flow variances
that exacerbate a high linepack condition (e.g.
overdelivery into Transporter at a Receipt Point(s)).
A "Draft" designation shall be applied to flow
variances that exacerbate a low linepack condition
(e.g. underdelivery into Transporter at a Receipt
Point(s)).