TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
9. CAPACITY RELEASE PROGRAM (Continued)
9.9 Awarding of Released Capacity (Continued)
(b) If a bid is received that exceeds the minimum but does not
conform completely to the reservation charge(s) and
reservation surcharge(s) and all the terms and conditions
specified in the Releasing Shipper's notice, then the
Acquiring Shipper(s) shall be the Bidding Shipper(s) who
offer(s) the highest bid. Provided, however, if such bid was
submitted as a bid in an open season relating to a pre-
arranged release and the Pre-Arranged Shipper matches such
offer, then the capacity shall be awarded pursuant to Section
9.9(g) hereof. If bids from two or more Bidding Shippers
result in bids of equal rank then the capacity shall be
awarded in accordance with Section 9.9(f) hereof.
Transporter shall evaluate and rank all bids submitted during
the open season. If Bidding Shipper has not removed its
contingency by the date specified by the Releasing Shipper
pursuant to Section 9.3(p) hereof, such bid shall be deemed
to have been withdrawn.
(i) Default Bid Evaluation Criteria - If Releasing
Shipper does not specify otherwise, all bids will be
evaluated pursuant to Option 4, Highest Rate.