El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
Third Revised Sheet No. 264 Third Revised Sheet No. 264
Superseding: Second Revised Sheet No. 264
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
8. OPERATING PROVISIONS
8.1 FIRM SERVICE (Continued)
(f) Flexible Receipt and Delivery Point(s) (Continued)
(iii)Re-designation of Existing Primary Points. Unless
conditioned by the applicable rate schedule, firm Shippers,
including Acquiring Shippers with express permission from the
Releasing Shipper to do so, may request to re-designate
primary point rights to any rate zone pursuant to the
following procedures. Transporter will grant such requests
on a first come/first served basis if firm capacity is
available to and at the requested points, the change will not
harm other firm Shippers, and the change is operationally
feasible. Requests for sales of capacity involving
incremental service will have priority over re-designation
requests.
(A) When a Shipper desires to re-designate primary point
rights, the Shipper must agree to the rate conditions
of Section 8.1(g)(i), the creditworthiness provisions
of Section 4.16, and the other conditions of this
Section. Unless otherwise agreed by Transporter on a
not unduly discriminatory basis, a Shipper may only
request to re-designate over an annual period either a
fixed and constant percentage of its monthly TCD or a
fixed and constant daily contract quantity.
1. Pursuant to Section 5.7 of the GT&C, when Shipper
requests re-designation of primary D-
Code/delivery point rights, such Shipper's
request shall include the MDQ at the D-Code level
and the related meter CMQs within that D-Code.
(B) A firm Shipper may submit only one re-designation
request at a time for the same TSA; however, a firm
Shipper wishing to re-designate a primary point for a
period of three Months or less may submit a request,
subject to the other conditions of this Section
8.1(f)(iii), to re-designate to a new primary point and
simultaneously submit a request to re-designate back to
the original primary point at the end of the re-
designation period.
(C) When a Receipt or Delivery Point is re-designated, the
related path rights are restated to reflect the newly
created Primary Receipt-to-Delivery Flow Path.