El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
Fifth Revised Sheet No. 254 Fifth Revised Sheet No. 254
Superseding: Fourth Revised Sheet No. 254
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
8. OPERATING PROVISIONS
8.1 FIRM SERVICE (Continued)
(e) (ii) Pathing (Continued)
(F) North-to-South Path Rights
1. N/S1 Flow Path rights are assigned to Shippers
with primary NPT receipt points and primary SPT
delivery points. The identified Flow Path for
N/S1 Path rights is from the primary NPT receipt
point to the primary SPT delivery point using the
Permian-San Juan Crossover, and, as necessary,
south flow capacity out of Plains, and capacity
from the Cornudas Station west towards the
Ehrenberg area using the South System.
2. N/S2 Flow Path rights are assigned to Shippers
with primary NPT receipt points and primary
delivery points on the Maricopa Line. The
identified Flow Path for N/S2 Path rights
includes 1) from the primary NPT receipt point to
Valve City, 2) from Valve City to the Maricopa
Line using the North System, and 3) the Maricopa
Line to the Shipper's Delivery Point.
3. N/S3 Flow Path rights are assigned to Shippers
with primary NPT receipt points and primary SPT
delivery points. The identified Flow Path for
N/S3 Path rights includes 1) from the NPT primary
receipt point to Valve City, 2) from Valve City
to Franconia using the North System, and 3) from
Franconia to the Shipper's Delivery Point(s) west
of Cornudas on the South System using the Havasu
crossover.
4. N/SV Flow Path Rights - A portion of the service
involving the North to South Path Rights
described above requires the use of displacement
capacity. N/SV capacity is deemed Primary
Capacity except when a Shipper uses alternate
points located on the Havasu Crossover at which
time the capacity will be assigned a First
Alternate scheduling priority. The percentage of
N/SV capacity is determined by the amount of
South-to-North flow capacity required to meet the
service requirements of firm North-to-South
Shippers on the effective date of this provision.