El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
Second Revised Sheet No. 253 Second Revised Sheet No. 253
Superseding: First Revised Sheet No. 253
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
8. OPERATING PROVISIONS
8.1 FIRM SERVICE (Continued)
(e) (ii) Pathing (Continued)
(D) North-to-North Path Rights
1. N/N1 Flow Path rights are assigned to Shippers
with primary NPT receipt points north of Valve
City and primary NPT delivery points. The
identified Flow Path for N/N1 Path rights
includes the San Juan Triangle to Valve City and
from Valve City west towards the Topock area
using the North System.
2. N/N2 Flow Path rights are assigned to Shippers
with primary NPT receipt points in the Plains
pooling area and primary NPT delivery points.
The identified Flow Path for N/N2 Path rights is
from Plains west towards the Topock area using
the North System.
3. N/N3 Flow Path rights are assigned to Shippers
with primary NPT receipt points in the San Juan
area and primary NPT delivery points in the
Anadarko area. The identified Flow Path for N/N3
Path rights is from the NPT Receipt Point to
Plains using the Permian-San Juan Crossover.
(E) South-to-South Path Rights
1. S/S1 Flow Path rights are assigned to Shippers
with primary SPT receipt points and primary SPT
delivery points. The identified Flow Path for
S/S1 Path rights is from the Cornudas Station
west towards the Ehrenberg area using the South
System.