El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
Second Revised Sheet No. 252 Second Revised Sheet No. 252
Superseding: First Revised Sheet No. 252
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
8. OPERATING PROVISIONS
8.1 FIRM SERVICE (Continued)
(e) Segmentation and Pathing (Continued)
(ii) Pathing - Path rights are available to and at, and all points
in between, the mainline locations on the following portions
of Transporter's mainline system, as limited by each
Shipper's Primary Receipt-to-Delivery Flow Path.
(A) The assignment of a Shipper's Primary Receipt-to-
Delivery Flow Path is only for the purposes of capacity
Segmentation and the implementation of this Section
8.1(e).
(B) All firm Shippers will be allocated within-the-path
rights through the assignment of a Flow Path, as
described below, to be designated in their TSAs. These
path rights, and related Segmentation and flexible point
rights, are defined below.
(C) North and South Designations
Points north of Dutch Flat Station on the Havasu
crossover and north and west of the south discharge of
Plains Station are considered "North Points" and for
purposes of this Section 8.1(e) are designated "NPT."
All points south of these locations, and all points on
the Maricopa line, are considered "South Points" and
for purposes of this Section 8.1(e) are designated
"SPT." TSAs with North Receipt Points and South
Delivery Points are considered to have North-to-South
path rights in the amount of the total MRQs/MDQs for
all such Receipt and Delivery Points. TSAs with South
Receipt Points and North Delivery Points are
considered to have South-to-North path rights in the
amount of the total MRQs/MDQs for all such Receipt and
Delivery Points.