El Paso Natural Gas Company

Second Revised Volume No. 1A

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective

Sixth Revised Sheet No. 238 Sixth Revised Sheet No. 238

Superseding: Fifth Revised Sheet No. 238

 

TRANSPORTATION GENERAL TERMS AND CONDITIONS (Continued)

 

6. NOMINATIONS AND SCHEDULING PROCEDURES (Continued)

 

6.2 Capacity Allocation Procedure (Continued)

(a) Firm Allocation (Continued)

(iii) All other firm transportation Shippers utilizing Flow

Point Secondary, Flow Path Secondary or Alternate

Capacity (including Segmentation) in the order listed

below. Capacity within each category shall be

scheduled within each group first to those shippers

paying the maximum tariff rates for any rate zone.

For scheduling priority purposes only, Short-Term

Rates that exceed the related maximum Long-Term Rates

will be deemed equivalent to maximum Long-Term Rates.

If allocations are required among the maximum rate

shippers, they will be performed on a pro rata basis

using contract MDQ. Service will be scheduled next to

those shippers paying discounted rates with the

highest reservation rates being scheduled first. If

allocations are required among discounted rate

shippers paying the same discounted rate, they will be

performed on a pro rata basis using contract MDQ.

 

(A) Firm Shippers using Flow Point Secondary Capacity.

 

(B) Firm Shippers using Flow Path Secondary Capacity.

 

(C) Firm Shippers using First Alternate Capacity.

 

(D) Firm Shippers using Second Alternate Capacity.

 

(iv) Service using Flow Point Secondary, Flow Path

Secondary, First Alternate, or Second Alternate

Capacity will be scheduled within each group for

capacity allocations at Delivery Points or along a

Flow Path. For purposes of allocating such capacity,

the following shall apply:

(A) Confirmed nominations shall be used to determine

capacity allocations, if any, at Flow Point

Secondary, First Alternate, and Second Alternate

points.

 

(B) When there is a constraint along a Flow Path, the

confirmed nominated quantity at or through the

constraint shall be used to determine capacity

allocations at or through such constraint when the

Flow Path scheduling priority assigned at the

constraint location is Flow Path Secondary, First

Alternate or Second Alternate.