El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
Sixth Revised Sheet No. 219A Sixth Revised Sheet No. 219A
Superseding: Fifth Revised Sheet No. 219A
TRANSPORTATION GENERAL TERMS AND CONDITIONS
(Continued)
4. REQUESTS FOR SERVICES
4.7 Capacity Reserved for Future Expansion Projects (Continued)
(b) Transporter may only reserve capacity for a future
expansion project for which an open season has been or will
be held within one Year of the date that Transporter posts
such capacity as being reserved. Transporter will not,
absent Commission approval, accept advance payments to
reserve capacity under this Section 4.7.
(c) If Transporter elects to reserve capacity, it will notify
Shippers of its intent as part of its posting of capacity
on its EBB. Transporter's posting for reserved capacity
for future expansion projects shall include the following
information: (i) a description of the project for which
the capacity will be reserved; (ii) the total quantity of
capacity to be reserved; (iii) the location of the proposed
reserved capacity on the pipeline system; (iv) whether, and
if so when, Transporter anticipates that an open season for
the capacity will be held or the reserved capacity will
otherwise be posted for bids; (v) the projected in-service
date of the new facilities; and (vi) on an ongoing basis,
how much of the reserved capacity has been sold on a
limited-term basis that would otherwise be eligible for a
right-of-first-refusal. The posting for reserved capacity
shall also include a non-binding solicitation for turnback
capacity to serve the expansion project, provided that
Transporter shall post the non-binding solicitation for
turnback capacity no later than 90 Days after the close of
the expansion project open season, specifying the minimum
term for a response to the solicitation. Transporter shall
make reasonable efforts to update the posting up to the in-
service date of the project to reflect any material changes
in the scope of the project.
(d) When reserving capacity for future expansion projects,
Transporter shall first post for bid all of its available
capacity prior to the reservation period. Transporter
shall post and award available capacity in accordance with
Sections 9.7 and 9.9 except for the open season posting
period which shall be at least five Business Days for all
capacity posted under this Section 4.7(d).