El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
Seventh Revised Sheet No. 113A Seventh Revised Sheet No. 113A
Superseding: Sixth Revised Sheet No. 113A
RATE SCHEDULE FT-H
Hourly Firm Transportation Service
(Continued)
2. APPLICABILITY AND CHARACTER OF SERVICE (Continued)
2.7 (Continued)
(c) Hourly Scheduled Entitlements transferred from a delivery point
must be equal to, or less than, Shipper's Hourly Scheduled
Entitlement pursuant to Shipper's FTH TSA, less hourly
deliveries to such point resulting from nominations for
delivery to that point.
(d) Hourly delivery transfers to delivery points shall not exceed
the quantity limitations for the time periods specified in
Shipper's FTH TSA.
(e) The transfer of such Hourly Scheduled Entitlements may not
affect service to any other firm Shipper.
2.8 To calculate the actual measured hourly rate of flow, should the
delivery meter be part of an aggregation of meters under a D-Code,
some or all of which have physical gas measurement equipment
compatible with Transporter's system and capable of registering
hourly flows, the quantities delivered to any such individual meters
in the D-Code shall be deemed to have flowed on a ratable 1/24th
basis if: 1) hourly measurement equipment is not installed or 2) the
hourly measurement equipment does not have active telemetry
capability (temporary outages excepted) into the VISA system on a
real time basis.
2.9 Shipper may submit a HEEN pursuant to Section 8.1(i) of the GT&C and
in accordance with this rate schedule.