El Paso Natural Gas Company
Second Revised Volume No. 1A
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-454-001, Status: Effective
Second Revised Sheet No. 29B Second Revised Sheet No. 29B
Superseding: Substitute First Revised Sheet No. 29B
STATEMENT OF RATES FOR TRANSPORTATION OF NATURAL GAS
FOOTNOTES
8/ The Tier 1 Service rates will be assessed only if the Article 11.2(a)
rates listed in Section 37 of the GT&C are not applicable. Provisions for
Tier 1 and Tier 2 Service are included in Rate Schedule FT-2.
9/ Daily authorized overrun rates shall be no more than the maximum daily
Short-Term or Long-Term load factor rate, as applicable, and no less than
the minimum daily usage rate, pursuant to the service for which the
overrun applies.
10/ Charges/penalties in non-Critical and Critical Conditions may apply to the
following rate schedules:
Charges/Penalties Rate Schedule(s)
Hourly Scheduling Penalty IT-1, FT-1, FT-2, FTH-V, FT-H, NNTD, NNTH
Daily Unauthorized Overrun FT-1, FT-2, FTH-V, FT-H, NNTD, NNTH
MDO/MHO Violation Penalty OPAS
SOC/COC Daily Imbalance IT-1, FT-1, FT-2, FTH-V, FT-H, NNTD, NNTH
11/ For purposes of assessing a penalty in a non-Critical Condition, "100% LF
IT rate" shall mean the 100% load factor Rate Schedule FT-1 Long-Term Rate
equivalent. The rates are as follows:
Production Area $0.1094
Texas $0.2896
New Mexico $0.3116
Arizona $0.4148
Nevada $0.4181
California $0.4257