East Tennessee Natural Gas, LLC

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index



Effective Date: 01/01/2009, Docket: RP09-76-000, Status: Effective

Original Sheet No. 341A Original Sheet No. 341A





17.3 Replacement Shipper's Request for Capacity


Any party that desires to acquire rights to transportation service may

submit to Transporter via e-mail to link-help@spectraenergy.com a

Replacement Shipper Request, which shall contain the following



(a) the Replacement Shipper's name and contact information;


(b) the Maximum Daily Transportation Quantity desired;


(c) the desired commencement date and term of the transportation



(d) the desired primary receipt and delivery points and the associated

Maximum Daily Receipt Obligation and Maximum Daily Delivery

Obligation for the transportation service;


(e) the maximum rate(s) that Replacement Shipper will pay for the

transportation service;


(f) whether Replacement Shipper will accept a release with recall

rights, and if so, what recall rights would be acceptable; and


(g) whether Replacement Shipper's Request is contingent, and if so,

the basis for the contingency.


Transporter shall post such Replacement Shipper Request on the LINK®

System for a period of one month or until a transaction is effected,

whichever is shorter.