East Tennessee Natural Gas, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/2009, Docket: RP09-76-000, Status: Effective
Original Sheet No. 341A Original Sheet No. 341A
GENERAL TERMS AND CONDITIONS (Continued)
17.3 Replacement Shipper's Request for Capacity
Any party that desires to acquire rights to transportation service may
submit to Transporter via e-mail to link-help@spectraenergy.com a
Replacement Shipper Request, which shall contain the following
information:
(a) the Replacement Shipper's name and contact information;
(b) the Maximum Daily Transportation Quantity desired;
(c) the desired commencement date and term of the transportation
service;
(d) the desired primary receipt and delivery points and the associated
Maximum Daily Receipt Obligation and Maximum Daily Delivery
Obligation for the transportation service;
(e) the maximum rate(s) that Replacement Shipper will pay for the
transportation service;
(f) whether Replacement Shipper will accept a release with recall
rights, and if so, what recall rights would be acceptable; and
(g) whether Replacement Shipper's Request is contingent, and if so,
the basis for the contingency.
Transporter shall post such Replacement Shipper Request on the LINK®
System for a period of one month or until a transaction is effected,
whichever is shorter.