East Tennessee Natural Gas, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/2009, Docket: RP09-76-000, Status: Effective
Third Revised Sheet No. 341 Third Revised Sheet No. 341
Superseding: Second Revised Sheet No. 341
GENERAL TERMS AND CONDITIONS (Continued)
(m) whether the Releasing Shipper wants to permanently release all rights to the
capacity;
(n) whether bids should be submitted in dollars and cents or percentage of the maximum
tariff rate; once the choice is made by the Releasing Shipper, all bids must
comport with this choice;
(o) [Reserved for Future Use]
(p) any other conditions of the release including the date when Releasing Shipper would
like biddable releases posted for bidding, if different than specified in Section
17.6 herein;
(q) e-mail address for the Releasing Shipper contact person. It is the Releasing
Shipper's responsibility to update e-mail address information provided to
Transporter as necessary;
(r) the recall notification period(s), as identified in Section 17.16(a) below, that
will be available for use by the parties;
(s) the scheduling priorities that Transporter is authorized to utilize in the event
that overlapping nominations submitted by the Releasing Shipper and any Replacement
Shipper are in excess of the Releasing Shipper's original MDTQ;
(t) whether the Releasing Shipper will allow the Replacement or Prearranged Shipper to
amend the Primary Receipt Point(s) and/or Primary Delivery Point(s) after the
capacity is awarded;
(u) whether the Prearranged Shipper is affiliated with the Releasing Shipper;
(v) whether the Releasing Shipper will allow the Replacement or Prearranged Shipper to
re-release the capacity acquired from the Releasing Shipper; and
(w) whether the proposed release is to an asset manager as part of an asset management
arrangement as defined in Section 284.8(h)(3) of the Commission's regulations or to
a marketer participating in a state-mandated retail access program as defined in
Section 284.8(h)(4) of the Commission's regulations, and, if the proposed release
is part of an asset management arrangement, the volumetric level of the asset
manager's delivery or purchase obligation and the time period during which that
obligation is in effect.
Any contingencies or special terms and conditions included in the Release Request shall
not be contrary to any applicable provision of this FERC Gas Tariff. Releasing Shipper
may elect not to reveal minimum conditions to anyone other than Transporter.